The project covered establishing a 230-kilometer water transmission pipeline, 15 storage tanks with a 451,000 cubic-meter capacity, and 4 pumping stations with a maximum capacity of 144,000 cubic meters per day.
In related news, the Arab Bureau for Design and Engineering Consultancy has been recently awarded a bid in an African country.
Source: Zawya